Iron-Airfoil Folding Laundry Rack, Drying Rack, Hanger Dryer(WS-2200)
Multifunctional clothes drying rack, appropriate for all kinds of clothes and shoes, saving house space and convenient for your life.
The detailed dimension and packaging can according to your request
1. Material: Iron pipe coating
2. Weight: 1.7KG/1.85PCS
3. Open size: 160cmX50cmX90cm /180cm*55cm*95cm,
Close size:121cm*50cm*4cm /131cm*55cm*4cm
4. Be convenient to move, do not take a place and damage your room or garden;
5. Perfect for drying any wet clothes, towel, socks, shoes and boots;
6. Sturdy construction perfect for daily use and for heavy wet winter clothes;
7. Outdoor and indoor all can be used.
8. This is a great drying rack for all seasons.
Item No |
unfold size |
weight(kg) |
Material |
Qty/carton |
meas(cm) |
8001 |
180*55*95 |
1.85 |
iron pipe 16,12,2.4 |
10 |
132*60*26 |
8002 |
106*55*95 |
1.5 |
iron pipe 16,12,2.4 |
10 |
132*60*19 |
8003 |
160*50*90 |
1.7 |
iron pipe 16,12,2.4 |
10 |
122*55*26 |
8004 |
96*50*90 |
1.4 |
iron pipe 16,12,2.4 |
10 |
122*55*19 |
![Iron-Airfoil Folding Laundry Rack, Drying Rack, Hanger Dryer (WS-2200)](//www.micstatic.com/athena/img/transparent.png)
![Iron-Airfoil Folding Laundry Rack, Drying Rack, Hanger Dryer (WS-2200)](//www.micstatic.com/athena/img/transparent.png)
![Iron-Airfoil Folding Laundry Rack, Drying Rack, Hanger Dryer (WS-2200)](//www.micstatic.com/athena/img/transparent.png)
![Iron-Airfoil Folding Laundry Rack, Drying Rack, Hanger Dryer (WS-2200)](//www.micstatic.com/athena/img/transparent.png)
![Iron-Airfoil Folding Laundry Rack, Drying Rack, Hanger Dryer (WS-2200)](//www.micstatic.com/athena/img/transparent.png)
![Iron-Airfoil Folding Laundry Rack, Drying Rack, Hanger Dryer (WS-2200)](//www.micstatic.com/athena/img/transparent.png)
![Iron-Airfoil Folding Laundry Rack, Drying Rack, Hanger Dryer (WS-2200)](//www.micstatic.com/athena/img/transparent.png)
![Iron-Airfoil Folding Laundry Rack, Drying Rack, Hanger Dryer (WS-2200)](//www.micstatic.com/athena/img/transparent.png)
1.About the delivery?
Usually, it will be 30 days to make the goods ready. And for first cooperation need 40-60days due to discussion time on confirm of new package and logo press. Chinese New Year holiday is excluded.
2.About the payment?
T/T.(as the payment, we need 30% as the advance, and the balance be paid off before the shipment.) Cash. L/C at sight.
3.About the price term?
FOB/CNF/CIF/EXW depends on customer's requirement.
4.About the feedback on the quality?
We make the inspection 100% for the production each time, and if you still find the defective products when you have the goods, please show me pictures with details and quality. We will resend goods or refund after verified the problem.
Contact us:
http://withsafe.en.made-in-china.com
http://withsafe.en.made-in-china.com/